Buying the plot is the first step. A little planning before construction can save a lot of money later.
Complete registry and mutation, and test the soil, before you finalise the foundation or pay a builder.
- Secure the plot and mark the boundary first.
- Test the soil before you finalise the foundation.
- Plan the budget and check local approval rules before you start.
1. Secure the plot
Complete the registry and apply for mutation so the land is in your name. See the mutation guide. Mark the boundary and consider a simple fence or wall so the plot is not encroached.
2. Test the soil
Soil decides the foundation type. Read our soil testing guide and speak with an engineer before you finalise the design.
3. Plan and budget
Decide the size and number of floors, then prepare a realistic budget with a margin for price changes. Our budget planning guide and materials guide help here.
4. Check approvals and utilities
Ask the local authority whether a building plan approval is needed for your area, and check how you will get water, electricity and drainage.
5. Choose a reliable builder or engineer
Ask to see earlier work, get quotes in writing and agree a payment schedule linked to progress.